Site#
Sq. ft
Cabinets
Devices
 
 
 
 

Type of Effort
 
Before Effort (Hours)
After Effort (Hours)
Savings
 
Change Request
0.00
Server Configuration Definition
0.00
How Long Does it Take to Find Resource?
- Space in Rack
0.00
- Available Power
0.00
- Available Cooling
0.00
- Available Network Connectivity
0.00
Time to Install Server and Connections
0.00
20% Re-work (due to inaccurate documentation)
0.00
Project Management
0.00
Coordination Meetings
0.00
Other
0.00
Totals per new server provisioned
0.00
0.00
0.00
Number of weekly changes (Include all Adds, Moves, Changes, and Decommissions)
Average hourly staff cost($)

Basic server setup, configuration and training

Setup and Training

Data Collection and Database Population Services
dcTrack has multiple components that require database population. Select those component you wish to implement
Implementation Method using Existing Electronic Documents
Implementation Method using On-Site Data Collection

Data Center Assets

Asset management is pre-requisite for Power and Connectivity management

Power Chain Connectivity

Structured Cabling and Data Connectivity

  1. What are your current data center challenges and pain points?

    Asset Tracking

    Workflow automation

    Capacity planning

    Reduce energy consumption

    Other

  2. Tell us about your DCIM project?

    a. Is there a project established to select DCIM?

    No

    Yes

    b. Is there a timeline for the project?

    No

    Yes

    c. Is there a budget for the project?

    No

    Yes

    d. Which title best reflects your position?
  3. How do you currently track the following?

    a. Floor plan management

    AutoCAD

    Visio

    Other

    b. Assets (model, rack unit)

    Spreadsheet

    Homegrown DB

    Other

    c. Network Connectivity

    Spreadsheet

    Homegrown DB

    Other

    d. Patch panels and cables

    Spreadsheet

    Homegrown DB

    Other

    e. Power connectivity

    Spreadsheet

    Homegrown DB

    Other

    f. IP space Management

    Spreadsheet

    Homegrown DB

    Other

    g. Change mgt system

dcTrack ROI Analysis

dcTrack Total Investment
Total Cabinets (Estimated): 0
Perpetual Software License: 0.00 $
Annual Maintenance: 0.00 $
Implementation Services: 0.00 $
Total First Year Investment: 0.00 $
Data Center Change Analysis
Hours spent per change (before): 0.00
Hours spent per change (after): 0.00
Hours saved per change: 0.00
Savings: 0.00
Number of weekly changes: 0
Hourly Rate: 0.00 $
Total savings per change: 0.00 $
Total savings per week: 0.00 $
Total savings per year: 0.00 $
Payback Period (months): 0.00%